Pricing

& Building Process

Green Magic Homes is a revolutionary construction system made with cutting-edge polymeric compounds, aero-space technology that offer the possibility of living integrated in nature, with total comfort, energy savings and very affordable prices.

Costs

There are 2 basic costs that affect your investment
0
GMH Technology
The cost of the technology corresponds to approximately 40% of the total cost.
0
Building and Finishes
An additional 60% is required for the completion of your home or project.
These percentages can vary substantially depending on your country, the cost of labor, transportation and the cost of materials.

*The buyer must assemble and build his project with the help of a General Contractor.

Transport

We have 4 production plants strategically located:
  • 1
    USA
    America
  • 2
    Spain
    Europe
  • 3
    México
    Latin America
  • 4
    Dubai
    Asia

which translates into low transportation costs to any country in the world.

We Provide:

  • 1
    Technology
    The technology composed by the structure
  • 2
    Screws & Elastomer
    The screws and the sealing elastomer
  • 3
    Floor Plans
    The construction floor plans
  • 4
    Assembly
    The assembly manual

BUILDING PROCESS

Here we briefly explain the steps to follow for the construction of your project with the Green Magic Homes technology.
Image module

DESIGN OF YOUR HOUSING OR PROJECT

WEEK 1

You can choose one of our pre-designed models or if you wish we can design your project tailored to your needs. If you want us to design your project, we place at your disposal our Architecture and Engineering department and we will develop the project of your dreams.

BUILDING PERMIT

WEEK 2

Green Magic Homes will provide the construction plans for license approval and engineering support. Once your permits are approved, you can proceed with the construction of the foundation.

Image module
Image module

FOUNDATION AND TECHNICAL INSTALLATIONS

WEEK 3

You can choose one of our pre-designed models or if you wish we can design your project tailored to your needs. If you want us to design your project, we place at your disposal our Architecture and Engineering department and we will develop the project of your dreams.

PERIMETER DRAINAGES

WEEK 4

Once the smelting of the foundation slab has been completed, a perimeter excavation must be made to the slab and the drainage system constructed to ensure the evacuation of rainwater and achieve total impermeability of your project. In the technology construction and assembly manual, we provide details of the drainage system.

Image module
Image module

SHELL ASSEMBLY

WEEK 5

When you receive your order for the technology, you will have completed all the previous steps and will be able to start the assembly of the structure immediately, without losing a single minute.

The assembly of the structure will take between 1 to 5 days, depending on the size of your project, through a simple procedure with components manufactured in molds made by robots.

DOORS, WINDOWS AND INTERIOR DIVISIONS

WEEK 6

Once the assembly of the structure has been completed, the doors, windows and interior divisions should be installed, firmly securing them to the structure, through a simple procedure explained in the assembly manual.

In our technology, everything has been thought in advance, so that you obtain a result of excellence.

Image module
Image module

ELECTRICAL INSTALLATIONS AND AIR CONDITIONING

WEEK 7

Subsequently, the power line must be built outside the structure, to power all the electrical boxes and wiring of your project, without limitations, so that you can place electrical points wherever you want.

In the technology construction and assembly manual, we provide details of the procedure for the installation of electrical points.

WATERPROOFING

WEEK 8

Then you must proceed with the sealing and waterproofing stage of the entire structure, perforations, joints and all points that require sealing, so that a perfect and lasting insulation is achieved, which will not require future maintenance.

We will give you details of the materials to be used to guarantee an optimal result, following the steps specified in the technology assembly manual.

Image module
Image module

THERMAL ISOLATION

WEEK 9

Having completely sealed the structure, you proceed to the application of thermal insulation sprayed, whose thickness will depend on the level of insulation required.

Our technology applies to all climates, from extreme heat of the desert, tropical climates to perpetual snow and extreme conditions.

COVERING WITH EARTH AND OUTDOOR GARDENS

WEEK 10

The next step is to erect the sloping walls on soil using a simple procedure that is explained in the assembly manual, which guarantees a healthy home for life.

We will explain how to achieve a perfect alignment so that the final result, once covered with grass and decorative gardens is absolutely impeccable and you have as a result a home that will be admired by all.

Image module
Image module

INTERIOR FINISHES AND DECORATION

WEEK 11

Finally, you must proceed with the interior finishes stage, with the aim of achieving beautiful and comfortable spaces that you can enjoy every day.

The furniture that you choose will give the final touch of beauty that emphasizes the magic that our green technology offers, to receive the positive energy that radiates in its interior coming from the nature that surrounds it.

YOUR GREEN MAGIC HOME FINISHED AND READY TO ENJOY

WEEK 12

Now you will have a Green Magic Home of a beauty difficult to match that you can enjoy all your life, in the middle of natural gardens, flowers, butterflies and birds that will visit your window in the morning filling your life with magic and happiness.

PRICES OF OUR TECHNOLOGY

To know the prices of our pre-designed models please complete the information requested and we will send you the price list via email shortly: