Is the roof covering procedure the one used for covering building roofs or it is the same as covering a terrain?

2020-08-26T14:40:24+00:00

"The roof covering procedure involves the waterproofing, thermal insulation and sealing of joints between the modules that compound all the structure of the home. The [...]

Is the roof covering procedure the one used for covering building roofs or it is the same as covering a terrain?2020-08-26T14:40:24+00:00

How are the panels fabricated to prevent water filtration, where the structure meets the foundation?

2020-08-21T17:31:35+00:00

To prevent the water leaks in between the modules and the slab, we use a sill plate gasket during the construction process. The sill plate [...]

How are the panels fabricated to prevent water filtration, where the structure meets the foundation?2020-08-21T17:31:35+00:00

How long will the production of a Green Magic Home take once the contract is signed and the deposit is paid?

2020-08-11T01:21:34+00:00

A 100 square meter (1,076 sq ft) house takes about 10 days to manufacture, but the exact delivery time will be determined at the time [...]

How long will the production of a Green Magic Home take once the contract is signed and the deposit is paid?2020-08-11T01:21:34+00:00

Can these homes be installed in extreme cold weather with snow, such as Canada or Alaska?

2020-08-11T01:16:12+00:00

Yes. For cold weather, our specifications include applying an extra thick layer of closed-cell insulating foam and then covered with a very wide layer of [...]

Can these homes be installed in extreme cold weather with snow, such as Canada or Alaska?2020-08-11T01:16:12+00:00

Are technical installations and the foundation included with the Green Magic Homes package?

2020-08-11T01:15:43+00:00

No, we provide the framing system, which when covered with soil, grass and natural gardens, allows you to live in harmony with the environment. Our [...]

Are technical installations and the foundation included with the Green Magic Homes package?2020-08-11T01:15:43+00:00

Will Green Magic Homes organize the construction and installation of the foundation of the house?

2020-08-11T01:12:31+00:00

No. The Green Magic Homes only provides the construction systems along with the necessary architectural drawings. The unit is constructed by a certified builder.

Will Green Magic Homes organize the construction and installation of the foundation of the house?2020-08-11T01:12:31+00:00

What type of maintenance does the garden covering the Green Magic Home need, once construction is finished?

2020-08-11T01:09:29+00:00

The type of vegetation used is always dependent on the climate conditions of the area where the structure is installed. As in any garden, if [...]

What type of maintenance does the garden covering the Green Magic Home need, once construction is finished?2020-08-11T01:09:29+00:00

How do the technical installations, such as plumbing, electrical and sewage, work with this technology?

2020-08-11T01:08:02+00:00

All technical pipeline connections are, as in any standard house, included within the slab foundation. With our technology, the components include ducts and electrical wiring [...]

How do the technical installations, such as plumbing, electrical and sewage, work with this technology?2020-08-11T01:08:02+00:00

Can new spaces and rooms be added on to a Green Magic Home after its construction has been finished?

2020-08-11T01:04:55+00:00

Yes. The system supports the connection of additional modules, but future growth should be planned from the beginning so the appropriate parts can be left [...]

Can new spaces and rooms be added on to a Green Magic Home after its construction has been finished?2020-08-11T01:04:55+00:00